
Framing & foundation takeoffs,
delivered by professional engineers.
Within 24 to 48 hours.50% off your first takeoff.
takeoff
Published prices, fast and accurate
- Framing (inc. hardware)
2,000 SF house = $500. Min $200.
$0.25per sf
- Foundation
2,000 SF house = $400. Min $150.
$0.20per sf
24–48
hours
Excel takeoff and live markup.
Engineer-
checked
Reviewed by a professional engineer.

Every takeoff is checked and delivered
by a professional engineer.
Khoi has designed and reviewed thousands of plans and bid and built hundreds of projects, so he knows what a drawing leaves unsaid and where a quantity quietly goes wrong.
Khoi Nguyen, P.E., GC
- CA Licensed Professional Engineer #89319
- CA Licensed General Contractor #1121625 (Class A & B)
- Former plan checker
- 20 years in construction & design
How you get your takeoff
Excel takeoff
Detailed line items.
Live markup via our portal
Check markup anywhere in plankore.ai.
Questions? Ask Khoi directly
Regular clients get free consultation with Khoi.

Send the plans. Get the takeoff.
Send the plans
Email a PDF plan set, or book a call and walk us through the job first. Tell us what you need measured.
We measure it
Measured on the drawings in Plankore, then reviewed line by line by Khoi before it leaves.
You get the list
Excel takeoff in 24 to 48 hours. Review markup in the Plankore platform and ask Khoi any questions.
Why framing and foundation
We take off every trade, but these two are where an engineer makes the biggest difference.
They are the structural trades
Framing and foundation quantities come off the structural drawings: shear wall and hold-down schedules, headers and beams, footings, stem walls and rebar. Reading those right is engineering work, and it is the work Khoi does every day.
Read with a plan checker's eye
Khoi spent years checking plans for approval. He knows where a structural set leaves things unsaid: the detail on another page, the general note that overrides the plan, the hold-down that only shows up in the schedule.
Where a miss costs the most
Lumber and concrete are the first big orders on a house. A short footing or a missed hold-down shows up in the field, on the crew's time. A takeoff checked by an engineer catches it on paper.
Framing, foundation, or every trade at once
Every one of these is measured on the drawings by our team and checked by Khoi before it reaches you. Take our two specialties, or send the set once and get every trade together.
Framing takeoff
Every framing member counted and listed by assembly: studs, plates, headers, beams, joists, rafters, trusses, sheathing and hardware.
$0.25 per sq ft, $200 minimum.
See how it worksOur specialtyFoundation takeoff
Cubic yards, formwork, reinforcing and hold-downs counted by placement: footings, grade beams, slabs, stem walls and piers.
$0.20 per sq ft, $150 minimum.
See how it worksAll trades at onceFull set takeoff
Every trade taken off together on one plan set, in one workbook, measured once so the numbers agree with each other.
Quoted per job. Quotes are free.
See how it worksNeed a trade that is not here? Tell us what you need measured and we will say honestly whether we can do it well. If we cannot, we will say so rather than take the job.
Get your takeoff in 24–48 hours.
Reviewed by a professional engineer.
50% off your first takeoff.
