P-Chat skills: framing takeoff and material order
Run a P-Chat skill from the chat, and what the two framing skills do - a full framing takeoff filed by construction phase, and a material order by phase built from the Report.
A skill is a long job P-Chat does to a set method, such as a full framing takeoff. You start it with a command that begins with /. Skills draw takeoff and write to the Report, so they need Plankore Pro or the free trial.
Run a skill
- Open the project in Plankore and open P-Chat there.
- Start your message with the skill: type
/at the start of the box, or click /Skill. Pick one from the list with the arrow keys and Enter, or click it. A new chat also shows each skill as a button. - Add anything P-Chat should know after the command, then send. For example:
/framing-takeoff The garage is existing, leave it out.
/framing-takeoff runs only from its command: ask for a framing takeoff in other words and P-Chat asks you to send /framing-takeoff instead. /framing-summary-report also runs when you ask for the material order in your own words.
/framing-takeoff
A framing material takeoff for ordering. P-Chat reads the drawings the way a structural engineer would, following the supports and load paths, and draws the framing on the sheets with the takeoff tools:
- What it draws: lumber and engineered lumber (plates, studs, headers, posts, beams, joists, rafters, rim), sheathing, hardware and fasteners. Beam, joist and post lengths are rounded up so nothing arrives short.
- Templates: it makes order-ready templates for the project and applies them to what it drew.
- Folders: it files the objects by construction phase, bottom to top, for example Foundation / Subfloor & First Floor Framing, then First Floor Walls, Second Floor & Lower Roof Framing, each with sub-folders (posts and beams, floor joists and sheathing, hardware and fasteners).
- Not counted: roof trusses are marked as trusses, not framed out. Where the drawings disagree, it picks the option that works structurally and notes that the detail needs checking or an RFI.
- Waste: none. Waste is added when you make the material order.
A house takes about half an hour to an hour. Stay in the project and in that chat while it works; you can move around the project. Leaving the project or switching chats doesn't stop it straight away: it can keep drawing, and using coins, until it ends. To stop it, click Stop in its chat (open it again from Chats if you switched). Closing the browser tab stops it.
When it finishes, check the takeoff the way you would a colleague's. See Check and undo what P-Chat changed.
/framing-summary-report
Turns a project's Report tab into an order-ready material list. Run it in the project after the framing takeoff, once its templates are applied. P-Chat reads the Report and adds two tabs beside it:
- Material order by phase: what to order for each construction phase, grouped under headings such as Phase A — Foundation / Subfloor & First Floor Framing.
- Material order all phase: every phase combined.
Each line is one item the yard sells, with the columns PHASE, ITEM, SIZE / GRADE, STOCK LENGTH, NET QTY, WASTE %, ORDER QTY, UNIT, USED FOR and PLAN REF (the all-phase tab has no PHASE, USED FOR or PLAN REF, and ends with PHASES). Along the way it:
- merges the same item across the Report, and orders pieces shorter than 8' as longer stock cut on site;
- adds waste by item, for example 10% on studs and 15% on plates and wall sheathing;
- orders nails and screws in boxes, and strap in coils.
To price the order, say so: /framing-summary-report Price the order. The tabs then add UNIT PRICE, AMOUNT, SOURCE and a TOTAL row. SOURCE says where each price came from: a store's price, starting Reference price: and naming the store, the region and the date, or a cost book line. A line with no price shows orange cells, and its SOURCE reads Not priced with the reason. These are reference prices to budget with, not a supplier's quote.
If P-Chat needs the Report while you are on another tab, it says P-Chat needs the Report tab to go on. Click Open Report.